Pokeno Industrial Park Water Supply in Pokeno

Maximum Electrical completed the in-house design, build, installation and commissioning of a 155kW bore pump control system for the Pokeno Industrial Park water supply.

The project included a high-flow pump with remote telemetry control, providing a reliable and remotely monitored water supply for the main site development.

Maximum Electrical delivered the complete pump control system for the main site development contractor, Dines Group, in conjunction with Waikato District Council.

Services Completed

  • Electrical engineering and in-house design
  • 155kW bore pump control system
  • High-flow pump installation
  • Remote telemetry control
  • Electrical installation
  • System commissioning
  • Water supply control system

This Pokeno Industrial Park project demonstrates Maximum Electrical's experience delivering complete electrical design, installation and commissioning for high-capacity pump control and water supply systems.