33kV Switch Replacement and High Voltage Upgrade

Maximum Electrical completed a 33kV switch replacement project requiring a complete plant shutdown and seven days of continuous work to complete the installation.

Due to the scale of the shutdown and the high-voltage work involved, detailed planning and health and safety risk management were required before the project commenced. Maximum Electrical developed a comprehensive project plan that reduced the planned shutdown duration by two days, helping to minimise disruption and reduce risk for the client.

The project was completed on time and within budget, with no safety incidents or cost overruns throughout the works.

Services Completed

  • 33kV switch replacements
  • High-voltage electrical works
  • Plant shutdown planning and management
  • Health and safety risk mitigation
  • High-voltage project coordination
  • Electrical installation and commissioning

This high-voltage upgrade demonstrates Maximum Electrical's ability to plan and deliver complex electrical projects in challenging operational environments, with a strong focus on safety, risk management and minimising plant downtime.